Preconstruction
document intelligence.

Province reads your drawings, specs, and addenda — Commercial, Industrial, Multifamily, Government, etc. — then answers questions and returns analysis your team actually uses. Constructability reviews, RFIs, scopes, bid packages, responsibility matrix. Same day turnaround with the precision of a senior estimator.

Trusted by teams shipping billions in construction

Product

A sharper second set of eyes in precon. Nothing left to assumption.

From upload to scope draft, every output is grounded in your governing documents — with citations, version awareness, and zero hallucinations. True page markup makes double-checking instant.

Documents & versions

Every revision, every set, in one place.

A central library for drawings, specs, contracts, and addenda — with full version history and change tracking. Ingest any format; we’ll keep the lineage straight.

  • Drawings, specs, schedules, contracts, geotech, ASIs, addenda
  • Full revision history with side-by-side change tracking
  • Ingest any format — PDF, DOC, Images, scanned drawings
Documents
Apr 16
  1. RevisionNew version uploaded4:47 PM
    Project Manual 2 of 2 — 04-15-2026.pdfCURRENT
    Specifications · 560 pp · v3
    Supersedes
    Project Manual 2 of 2 — 100% QC.pdfSUPERSEDED
    Specifications · 566 pp · v2 · Apr 1
  2. UploadConstruction Documents 04-154:42 PM
  3. UploadProject Manual 1 of 2 — 04-15-2026.pdf4:38 PM
  4. UploadGeotech Report — Langley & Assoc.Apr 12 · 9:14 AM
Comprehensive constructability

Every page cross-checked at every stage and update.

Every issue linked to the exact sheet(s), spec section, and location on any document. Not a summary. Not a narrative. A clickable reference your team can act on immediately — complete with markup and highlight.

Assistant

What waterproofing is specified at the plaza deck?

Province

A hot fluid-applied rubberized asphalt membrane (min 215 mil) per 07 14 00 §2.2.A. Detail 3/A-501 shows a cold-applied sheet — likely a conflict.

Which trades are affected if we go with the spec?

Province

Three: waterproofing (07 14 00), concrete deck prep (03 35 00), and landscape pavers above. Drainage detail on L-301 may need revision.

Draft RFIShow conflictFind on plan
Reliable RFIs

Conflicts, surfaced before they cost you.

Automated audits across the entire set — drawings, specs, contracts. Severity-ranked, citation-backed, and exportable as RFIs even in SD.

  • Drawings to specs to addenda
  • Severity-ranked risk flags with default-position comparisons
Audit
Finding$Status
  • CRITICALBid-day blocker / life safety
    1
  • Riser height and tread depth uniform throughout each stair flight
    L
  • HIGHTrade handoff / coordination risk
    22
  • All one-line panels have matching panel schedules
    LOpen
  • All plan equipment appears in mechanical schedule
    LOpen
  • Panel OSL1 main breaker size — one-line vs. panel schedule discre…
    MOpen
  • MEDIUMSpec gap / clarification needed
    14
  • Sealant manufacturer not listed in 07 92 00 §2.1
    LOpen
  • Door 104A — fire rating missing from door schedule
    MOpen
  • Concrete strength mismatch between 03 30 00 and S-101 notes
    MOpen
Budget-ready scopes, instantly

Complete coverage scope generation — even at DD

Complete scopes-of-work by division with inclusions, exclusions, and defined trade boundaries. Every line item includes a clickable sheet code and page reference so subs can go directly to the detail. Nothing left to interpretation. Ready for bid leveling months in advance.

  • Automatically flags missing, unclear, or conflicting scope
  • Every line item traced back to drawings and specs
  • Exports to Excel, Word, or directly into procurement tools
Scope

Finish Carpentry / Trim Installation

BP-06.1

Specification Sections

2
Spec #DescriptionResp.
  • 08 11 13Hollow Metal Doors & FramesI
  • 08 71 00Door HardwareI

Highlighted Inclusions

25
  1. 1.

    Furnish and install hollow metal door frames per Section 08 11 13Project Manual 1 of 2 · 08 11 13 · p. 412“Hollow metal door frames shall be 16-gauge cold-rolled steel, factory primed, with welded corners and integral anchors per ANSI/SDI A250.8.”§2.1.AView source →. Coordinate with BP-08.3. Reference Sheets A8.0, A1.1.

  2. 2.

    Receive and install all new hollow metal door leaves into installed frames, including adjustment for proper clearances per 08 11 13.

  3. 3.

    Provide door hardware including hinges, locksets, closers, and stops per 08 71 00 and the door hardware schedule.

How it works

We work like a subcontractor, not another software vendor.

No annual contract. Absolutely no platform to onboard. This is not another tool your team needs to learn. Send us your documents and we deliver everything in a day.

The whole picture

Every document, connected for the life of the project

Drawings, specifications, addenda (and more addenda!) — parsed, classified, and cross-linked. We track every revision and addendum, decode drawing references, and surface relationships across thousands of documents so nothing falls through the cracks.

  • Before and after sheet update markup and narrative
  • Tracks revisions, addenda, and scope changes
  • Comprehensive cross-document references
  • Construction-tuned, not a hallucinating AI
Province AI
Southbay Tower
34,325 Components · 126,701 Activities
Drawings1,247
Specifications412
Civil Drawings38
RFIs203
Code Compliance94
Scopes11
Ask

Cited answers in seconds

Plain-English questions across the entire set — every answer linked back to the exact page, section, or detail.

Audit

Issues caught before bid

Conflicts between drawings, specs, and contracts surfaced and ranked by severity, with proposed RFIs ready to send.

Author

Bid-ready scopes

Coordinated scope-of-work bid packages drafted directly from your docs, with every line traced to its source.

Get started

Stop reading the set.
Start asking it.

See Province on your own project. Book a quick 15-minute review and walkthrough.