A sharper second set of eyes — on every page.
Province audits the whole set — drawings, specs, contracts — and returns real constructability findings, not a summary. Each one is ranked by severity, scored for confidence, and grouped by the kind of risk it represents, so you triage the bid-day blockers first.
- Severity
- how much it hurts if missed — Critical / High / Medium / Low.
- Confidence
- how sure Province is the finding is real — High / Medium. The anti-hallucination tell.
- Severity and confidence on every finding
- Grouped by risk type, not a flat list
- Status workflow (Open →) so the team works the queue
- HIGHTrade handoff / coordination risk
- Underslab Plumbing Penetrations through FoundationsCONFHighOpen
- Significant grade differential between FFE and adjacent parking — retaining wall coordination neededCONFHighOpen
- MEDIUMInternal consistency / clarification
- Ductwork Penetrations through Wood Joist FramingCONFMedOpen
- Missing Drain Pan and Piping Details for Water HeatersCONFHighOpen
- Fire-rated wall assembly tags conflict between A601 and G002CONFMedOpen
- Critical0
- High2
- Medium23
- Low12
- High28
- Medium9
