Catch the conflict before it's a change order.

Province cross-checks drawings, specs, and addenda across the entire set — surfacing conflicts severity-ranked and citation-backed, then tracking every change as the project evolves so nothing slips between revisions.

Citation-backedZero hallucinationsSame-day turnaround
Constructability findings

A sharper second set of eyes — on every page.

Province audits the whole set — drawings, specs, contracts — and returns real constructability findings, not a summary. Each one is ranked by severity, scored for confidence, and grouped by the kind of risk it represents, so you triage the bid-day blockers first.

Two independent axes
Severity
how much it hurts if missed — Critical / High / Medium / Low.
Confidence
how sure Province is the finding is real — High / Medium. The anti-hallucination tell.
  • Severity and confidence on every finding
  • Grouped by risk type, not a flat list
  • Status workflow (Open →) so the team works the queue
Findings
37 findings·100% CD·808 sheets
  • HIGHTrade handoff / coordination risk
  • Underslab Plumbing Penetrations through Foundations
    CONFHighOpen
  • Significant grade differential between FFE and adjacent parking — retaining wall coordination needed
    CONFHighOpen
  • MEDIUMInternal consistency / clarification
  • Ductwork Penetrations through Wood Joist Framing
    CONFMedOpen
  • Missing Drain Pan and Piping Details for Water Heaters
    CONFHighOpen
  • Fire-rated wall assembly tags conflict between A601 and G002
    CONFMedOpen
Severity
  • Critical0
  • High2
  • Medium23
  • Low12
Confidence
  • High28
  • Medium9
Evidence, on the page

Every finding opens to the drawing it came from.

Click any finding and Province lays out a plain-English explanation, the exact sheets it's drawn from, and the live drawing — so a reviewer can confirm the conflict in seconds, not chase it across the set.

  • Plain-English reasoning, not a code dump
  • Evidence linked to the exact sheets
  • The drawing is right there — verify without leaving the finding
Finding
MEDIUMCONFHighOpen

Missing Drain Pan and Piping Details for Water Heaters

Internal consistency / clarification · mechanical

M301 states ‘WATER HEATER SHALL BE PROVIDED WITH A DRAIN PAN AND DRAIN PIPING.’ However, the plan on M110 does not depict these drain pans or routing to a suitable drain.

EvidenceM110M301
M110 · Multi-zoom100%
WH-1
no drain pan
Document changes

Pick two issues. See exactly what moved.

Choose any two document sets — 95% CD → 100% CD, or an addendum against the set it revised — and Province maps every change through four lenses: Files, Systems, Bid packages, and Sheets.

  • Four lenses on one change set
  • Added / changed / removed, plus constraints & coordination notes
  • Filter by discipline
Document Changes
From95% CDTo100% CD
FilesSystemsBid packagesSheets
  • CHANGED6
  • BP-23.1 HVACApartment air handlers switched from AWST to ARST series
  • BP-26.1 ElectricalPanel schedule revised — unit feeder sizes increased
  • ADDED2
  • BP-07.4 Fire ProtectionStandpipe added at Stair 3, levels 1–4
  • COORDINATION3
  • BP-23.1 / BP-06.3ARST units increase joist penetration size — confirm framing
Also in Systems lens
DIV 05 Structural SteelDIV 23 HVAC
Sheet-level diff

Every sheet, before and after — with the trades it touches.

Open any sheet to a side-by-side of the old and new drawing, a plain-English change summary, and the exact bid packages affected. Change level is graded so you triage what matters.

  • True side-by-side drawing markup
  • Change level so you triage fast
  • Every change mapped to the bid packages it impacts
Sheet Diff
SheetDiscTitle & changesLevelBPs
  • A202ArchBuilding F & Clubhouse Roof Plans — 5 changesSignificant4
  • S301StructFoundation details — bearing notes revisedModerate2
  • M110MechLevel 1 mechanical plan — diffuser tags updatedMinor1
A202Building F & Clubhouse Roof PlansSignificant5 changes
  • Roof slope revised at clubhouse — added cricket behind parapet
  • Fire-rated assembly added at party wall to roof deck
AffectsBP-06.3 FramingBP-07.4 Fire ProtectionBP-07.2 RoofingBP-09.2 Drywall
95% CD
100% CD
The whole timeline

Track every change element across the life of the set.

Province holds the lineage from schematic design through CDs and into post-IFC addenda and bulletins — so you can answer ‘what changed since we priced this’ at any moment.

Set Timeline
  1. SDSchematic
  2. DDDesign Dev
  3. 95% CDConstruction
  4. 100% CDCurrent
  5. Addendum 1Post-bid
  6. IFCFor Constr.

‘What changed since we priced this?’ — pick any two nodes and Province maps the delta to the bid packages it hits.

  • SD → IFC → addenda, one continuous history
  • Identify exactly which bid packages an addendum or bulletin hits
  • Construction-tuned, not a hallucinating AI
Get started

Stop reading the set.
Start asking it.

See Province on your own project. Book a quick 15-minute review and walkthrough.